In March, the Steering Committee met with church staff and Food Ministry representatives to get their input on the use of space as presented in the preliminary architectural drawings provided by our architect, David B. Singer. Van Note Harvey was hired as our civil engineering firm, and they are initiating work on a ground survey.
If you haven’t yet made a commitment to support the Capital Project, please consider doing so. Recall that our original “wish list” came with a $1.7 MM estimated price tag, and the goal we ultimately decided on (at the recommendation of our consultant) is $1.1 MM. We have $920,000 pledged so far. The higher our pledge commitments, the more “wish list” items we will be able to include in the renovation plans.
Keep an eye out for news bulletins on the UUCWC website, the lobby screen, and these monthly Cross Currents updates!